Create an Account - Increase your productivity, customize your experience, and engage in information you care about.
This address would be provided by the Building Department along with the Building Permit Number
Please provide information that may be important
The installation of your meter will usually take two weeks from the time of your meter purchase
As part of our on-going efforts to ensure the safety of your drinking water, we are required to protect our system against cross connections. As described in the enclosed brochure, cross connections are connections between the drinking water plumbing and a source of contamination. Cross-connections can make our drinking water unsafe. The purpose of this questionnaire is to help determine if you have any special plumbing or activities that pose an increased risk of contamination to our water system. Please fill out the following questionnaire and check the appropriate boxes below:
Check all that apply
By checking the "I agree" box below, you agree and acknowledge that 1) your application will not be signed in the sense of a traditional paper document, 2) by signing in this alternate manner, you authorize your electronic signature to be valid and binding upon you to the same force and effect as a handwritten signature, and 3) you may still be required to provide a traditional signature at a later date.
This field is not part of the form submission.
* indicates a required field